WINDFORCE PLC Financial Summary

WIND.N0000 · WINDFORCE PLC · Utilities · 2026-11-11

WindForce PLC Financial Summary and Investment Analysis

Executive Overview

WindForce PLC is Sri Lanka’s pioneer and largest Independent Power Producer (IPP) in the renewable energy sector, commanding approximately a 14% overall market share in the domestic renewable energy space and 50% of the nation's installed wind capacity among independent power producers. Founded in July 2010 and listed on the Colombo Stock Exchange (CSE) in April 2021, the company manages the full lifecycle of renewable power generation—spanning feasibility studies, engineering design, procurement, construction, commissioning, and operation & maintenance (O&M).

As of September 30, 2026, WindForce operates a diversified operational generation portfolio of 267.8 MW across 31+ plants located in Sri Lanka, Uganda, Pakistan, and Ukraine, with 62% of capacity situated domestically. The group's energy generation mix comprises three core renewable technologies: wind, solar (including ground-mounted, rooftop, agrivoltaics, and floating solar), and small hydropower, complemented by forward integration into grid-scale Battery Energy Storage Systems (BESS) and diversification into sustainable electric mobility (electric two-wheelers via Satva Automotive).

Across the historical periods reviewed, WindForce demonstrated consistent top-line growth, reaching a record annual consolidated revenue of LKR 8,040.26 million in the year ending March 31, 2026, and delivering LKR 5,609.60 million in the first half of the year ending March 31, 2027 (representing 20% year-over-year revenue expansion). While headline net profit in the year ending March 31, 2026 moderated slightly to LKR 2,151.24 million (from LKR 2,249.69 million in the preceding year) due to the absence of prior-period non-recurring income (LKR 708 million in CEB tariff arrears settlements and LKR 482 million in rooftop solar disposal gains) and industry-wide grid curtailments (costing approximately LKR 317 million in foregone revenue), underlying normalized earnings grew by 62%.

The company is in an aggressive capital expenditure cycle aimed at more than doubling its total portfolio capacity from 253 MW to 548 MW (an addition of ~295 MW). Key active developments include the flagship 100 MW Rividhanavi Solar Project in Siyambalanduwa, 13 utility-scale standalone BESS projects totaling 130 MW / 520 MWh (with the first 10 MW / 40 MWh commissioned in September 2026), the 5 MW Diya Janani floating solar plant (commissioned September 2026), and the 10 MW Safe Power Alankuda wind project. Long-term financing has been secured through an International Finance Corporation (IFC) USD 18 million facility and a consortium-led domestic syndicated term debt facility of LKR 22.74 billion and USD 33 million. Fitch Ratings maintains an affirmed national long-term credit rating of A+(lka) with a Stable Outlook.

Key periods covered: Natural calendar quarters Q4 2023 through Q3 2026 (periods ending December 31, 2023, through September 30, 2026) and annual periods ending March 31, 2024, March 31, 2025, and March 31, 2026.


Financial Performance

Revenue and Profitability Trends

The following table provides consolidated financial results across 12 consecutive natural calendar quarters, tracking top-line progression, direct costs, operational profitability, and bottom-line margins:

Period (Calendar)Revenue (LKR '000)*Gross Profit (LKR '000)Net Profit/Loss (LKR '000)GP Margin (%)NP Margin (%)
Q4 2023 (to Dec 31, 2023)1,270,044564,99698,71344.49%7.77%
Q1 2024 (to Mar 31, 2024)1,895,1761,152,94569,80160.84%3.68%
Q2 2024 (to Jun 30, 2024)2,201,5791,467,845652,07466.67%29.62%
Q3 2024 (to Sep 30, 2024)2,459,6171,512,0111,205,75761.47%49.02%
Q4 2024 (to Dec 31, 2024)1,419,932668,989188,47247.11%13.27%
Q1 2025 (to Mar 31, 2025)1,530,040480,386203,38631.40%13.29%
Q2 2025 (to Jun 30, 2025)2,124,0041,313,367832,27561.83%39.18%
Q3 2025 (to Sep 30, 2025)2,555,6021,553,455935,74760.79%36.62%
Q4 2025 (to Dec 31, 2025)1,807,253814,542349,82045.07%19.36%
Q1 2026 (to Mar 31, 2026)1,554,026559,654(18,310)36.01%-1.18%
Q2 2026 (to Jun 30, 2026)2,620,1161,460,369874,60755.74%33.38%
Q3 2026 (to Sep 30, 2026)2,989,4811,751,496982,04158.59%32.85%

*\*Note: Revenue includes baseline electricity supply, management/O&M fees, EPC revenue, automotive sales, and contractual billings under Standardized Power Purchase Agreements (SPPA arrears).*

Annual Full-Year Summary (Periods Ending March 31)

Metric (LKR '000)FY 2023/24 (Q1 2024 12M)FY 2024/25 (Q1 2025 12M)FY 2025/26 (Q1 2026 12M)YoY Growth (FY26 vs FY25)
Consolidated Revenue5,851,8006,902,6908,040,257+16.48%
SPPA Arrears Income664,459708,478649-99.91%
Cost of Sales(2,651,715)(3,481,938)(3,790,603)+8.86%
Gross Profit3,864,5434,129,2304,250,304+2.93%
Operating Profit (EBIT)2,855,8383,015,2442,751,021-8.76%
Net Finance Cost(862,075)(658,660)(665,218)+1.00%
Share of Associate Profit561,340593,319367,938-38.00%
Profit Before Tax (PBT)2,555,1042,949,9022,453,741-16.82%
Tax Expense(804,510)(700,213)(302,505)-56.80%
Profit After Tax (PAT)1,750,5942,249,6902,151,236-4.38%
PAT Attributable to Parent1,549,5461,787,0781,539,589-13.85%
Reported GP Margin66.04%59.82%52.86%-6.96 pp
Normalised GP Margin—49.56%52.86%+3.30 pp
Reported EBIT Margin48.80%43.68%34.22%-9.46 pp
Normalised EBIT Margin—26.36%33.95%+7.59 pp
Reported NP Margin29.92%32.59%26.76%-5.83 pp
Normalised NP Margin—19.12%26.61%+7.49 pp

Analysis of Revenue & Profitability Trends

  1. Pronounced Operational Seasonality: Wind generation patterns in Sri Lanka are heavily concentrated in the Southwest monsoon (May to September), causing Q2 and Q3 of each calendar year to generate peak revenues and operating cash flows. In Q3 2026, quarterly revenue reached a high of LKR 2.99 billion with a PAT of LKR 982.04 million, compared to the seasonally trough quarters of Q1 2026 (revenue of LKR 1.55 billion and a net loss of LKR 18.31 million) and Q4 2025 (revenue of LKR 1.81 billion and PAT of LKR 349.82 million). Mini-hydro partially offsets this by generating higher yields during year-end rainfall seasons, though hydro represents a smaller 11.5% share of electricity supply revenue.
  2. Impact of Prior-Period Non-Recurring Income: Comparison of reported headline profit across the annual periods reflects substantial distortions from one-off events in FY 2024/25 (year ending March 31, 2025):
  • LKR 708.48 million in delayed payments from the Ceylon Electricity Board (CEB) under the Standardized Power Purchase Agreement (SPPA) recognized as one-off revenue.
  • LKR 482.13 million gain recorded from the partial divestment of rooftop solar assets (Suryadhanavi and Hirujanani) to related-party owners as part of a strategic shift toward utility-scale assets.
  • Excluding these pre-tax one-offs totaling LKR 1.19 billion, normalized EBIT surged by 50.1% YoY in FY 2025/26 from LKR 1.82 billion to LKR 2.73 billion, and normalized PAT increased 62.0% YoY from LKR 1.32 billion to LKR 2.14 billion.
  1. Grid Curtailments and Revenue Loss: A primary headwind across late 2025 and 2026 has been mandatory grid curtailments imposed by the National System Operator (NSO / formerly CEB) during low-demand periods (principally weekends) to maintain grid frequency:
  • In the twelve months ending March 31, 2026, grid curtailments resulted in an estimated generation loss of 20.6 GWh across all sectors (solar: 8.77 GWh; wind: 6.75 GWh; hydro: 5.04 GWh), translating into a direct top-line revenue loss of LKR 317 million.
  • In the six months ended September 30, 2026, curtailments reduced potential generation by an estimated 11.5 GWh, causing an additional revenue loss of LKR 193.57 million (including LKR 88.6 million in Q2 2026).
  • Although the Public Utilities Commission of Sri Lanka (PUCSL) approved a compensation framework directing the NSO to compensate generators under contractual SPPA tariffs, inter-agency implementation discussions remain ongoing, leaving the timing of financial recovery uncertain.
  1. Segmental Revenue Shift: Within core electricity generation, the revenue contribution of the solar sector expanded rapidly from 34% in FY 2024/25 to 40% in FY 2025/26 (reaching LKR 2.64 billion, up 32% YoY), driven by a full year of generation from the 10 MW Kebitigollewa plant (commissioned August 2024) and partial contributions from the 10 MW Sooryashakthi plant (commissioned July 2025). Concurrently, adjacent business lines diversified total group turnover: the automotive segment (electric two-wheelers) grew 195% YoY to LKR 492.94 million, and EPC/Engineering revenues climbed 120% YoY to LKR 725.04 million in FY 2025/26. In the 3-month period ending September 30, 2026 (Q3 2026), solar generation revenue expanded 23% YoY to LKR 1.66 billion, while wind revenue rose 7% YoY to LKR 2.40 billion.

Balance Sheet Analysis

The group's balance sheet underwent a major transformation between March 31, 2024, and September 30, 2026, transitioning into a capital-intensive project execution phase for grid-scale solar and BESS infrastructure.

Balance Sheet Item (LKR '000)As at Mar 31, 2024 (Audited)As at Mar 31, 2025 (Audited)As at Mar 31, 2026 (Audited)As at Jun 30, 2026 (Unaudited)As at Sep 30, 2026 (Unaudited)
Property, Plant & Equipment23,017,69524,796,11324,781,96331,901,47836,425,109
Investments in Associates/JVs4,800,2834,913,6305,541,5865,679,7546,565,628
Other Non-Current Assets2,962,5382,622,5652,873,0382,861,4852,797,628
Total Non-Current Assets30,780,51632,332,30733,196,58740,442,71745,788,366
Inventories681,7351,101,3971,373,0591,250,5231,223,625
Trade & Other Receivables2,489,7601,628,6653,218,9212,109,0543,216,095
Project Advances & Other Rec.—755,9721,674,6499,792,21010,875,559
Short-Term Financial Assets2,087,1823,053,3743,995,3551,569,8971,617,681
Cash & Cash Equivalents1,758,0081,195,9492,149,8242,233,0631,815,607
Other Current Assets244,659175,797148,29994,714134,616
Total Current Assets7,261,3457,092,14410,885,45717,049,46018,883,183
Total Assets38,041,86139,424,45244,082,04457,492,17764,671,549
Non-Current Borrowings7,542,6299,049,0399,184,85120,419,57925,038,625
Other Non-Current Liabilities2,111,2461,935,3032,021,5742,139,5952,248,941
Total Non-Current Liabilities9,653,87510,984,34211,206,42522,559,17427,287,566
Current Borrowings & Leases2,426,4681,394,5473,230,1091,871,2942,948,019
Trade & Other Payables444,270628,804613,153938,1231,475,288
Other Current Liabilities57,71317,48656,76241,43124,079
Total Current Liabilities2,928,4512,040,8383,900,0242,850,8474,447,386
Total Liabilities12,582,32713,025,17915,106,44925,410,02131,734,952
Stated Capital18,226,45618,226,45618,341,65318,353,51518,377,679
Retained Earnings4,178,5004,510,5966,048,6666,810,9157,658,868
Reserves & Other Equity589,228529,603998,097983,826963,838
Parent Shareholders' Equity22,994,18423,266,65525,388,41626,148,25627,000,385
Non-Controlling Interest2,465,3503,132,6173,587,1795,933,8995,936,212
Total Equity25,459,53426,399,27228,975,59532,082,15532,936,597
Net Asset Value Per Share (LKR)17.0217.2218.7519.3019.92

Liquidity, Solvency, and Asset Structure Insights

  • Balance Sheet Expansion: Between March 31, 2026, and September 30, 2026, total assets expanded by 46.7% from LKR 44.08 billion to LKR 64.67 billion. This was driven by property, plant, and equipment additions (rising to LKR 36.43 billion) and a dramatic increase in project advances and equipment procurement assets (reaching LKR 10.88 billion) associated with the concurrent construction of the Rividhanavi 100 MW solar park and the 130 MW / 520 MWh BESS project portfolio.
  • Leverage and Solvency: Gross interest-bearing debt (loans, leases, and overdrafts) rose from LKR 10.43 billion in March 2025 to LKR 12.77 billion in March 2026, and surged to approximately LKR 28.01 billion by September 30, 2026, following syndicated loan drawdowns. Net debt stood at LKR 6.63 billion at the end of FY 2025/26 and approximately LKR 24.58 billion by September 2026. The gross gearing ratio (interest-bearing debt to equity + debt) was managed at 30.52% as of March 31, 2026 (comfortably within the management policy band of 25% to 50%), supported by a growing equity base of LKR 28.98 billion (reaching LKR 32.94 billion by September 30, 2026).
  • Liquidity Profile: The current ratio stood at 2.79x as of March 31, 2026 (with net working capital of LKR 6.99 billion), and widened to 4.25x as of September 30, 2026, supported by substantial short-term deposits and project advance assets. The quick ratio as of March 31, 2026, was 2.44x.
  • Working Capital Elongation: Trade receivable days stretched to 70 days in FY 2025/26 (from 46 days in FY 2024/25), and inventory holding periods lengthened to 132 days (from 115 days), expanding the cash conversion cycle to 143 days (from 96 days). This reflected inventory buildup for the automotive and EPC units and extended settlement cycles from state offtakers. By September 30, 2026, trade receivables stood at LKR 3.22 billion.

Cash Flow Analysis

Consolidated cash flow movements across the last three annual periods and the latest interim periods show the operational cash generation and significant capital deployments:

Cash Flow Summary (LKR '000)FY 2023/24 (Audited)FY 2024/25 (Audited)FY 2025/26 (Audited)6M to Sep 30, 2025 (Unaudited)6M to Sep 30, 2026 (Unaudited)
Operating Cash Flow (before WC)5,769,4464,489,4004,925,7953,299,2613,700,213
Working Capital Changes2,245,488625,902(1,849,422)(1,796,477)(9,878,053)
Interest Paid(1,240,413)(1,029,657)(1,010,200)(443,124)(627,009)
Taxes Paid (Income, WHT, Div)(809,070)(946,070)(546,605)(289,871)(182,653)
Net Cash from Operating Activities5,960,6603,139,3241,519,036769,645(6,989,578)
Capex (Purchase of PP&E)(4,242,898)(2,723,136)(1,735,096)(1,321,346)(12,694,986)
Disposal of PP&E / Net Step Acq.864,0232,611,56516,839144—
Interest & Dividend Income729,504370,996549,048119,470126,500
Investments in JVs / Associates(150,000)(132,000)(458,000)—(750,000)
Other Investing (FDs / Share Allot.)910,125(1,056,783)(784,981)(858,148)4,611,173
Net Cash from Investing Activities(1,889,246)(929,357)(2,412,189)(1,577,879)(8,707,313)
Net Borrowings (Drawdown - Repay)(11,942)(911,121)2,021,476970,96115,499,800
Dividends Paid (Parent Equity)(1,350,769)(1,350,769)———
Dividends Paid to NCI(722,941)(437,442)(247,283)(44,668)(122,062)
Other Financing (Leases, ESOS, Buyback)826,168(24,677)27,5331,93314,090
Net Cash from Financing Activities(1,259,485)(2,724,010)(1,801,726)919,55215,391,829
Net Change in Cash & Equivalents2,811,929(514,043)908,573111,318(305,062)
Closing Cash & Cash Equivalents1,707,0121,192,9692,101,5421,304,2871,796,480

Cash Flow & Capital Allocation Dynamics

  • Operating Cash Flow Compression from Working Capital Build: Operating cash flows moderated from LKR 3.14 billion in FY 2024/25 to LKR 1.52 billion in FY 2025/26 due to working capital expansion (LKR 1.59 billion increase in receivables and LKR 271.66 million inventory build). In the first half of the year ending March 31, 2027 (6M to Q3 2026), working capital requirements escalated to LKR (9.88) billion, reflecting procurement outlays for transmission lines, BESS batteries, and panels, causing net operating cash flow to record an interim deficit of LKR (6.99) billion.
  • Capital Expenditure Acceleration: Capital investments in property, plant, and equipment were LKR 1.74 billion in FY 2025/26, following LKR 2.72 billion in FY 2024/25. In the 6 months to September 30, 2026, PP&E acquisitions surged to LKR 12.69 billion as construction of the 100 MW Rividhanavi solar plant and 13 BESS sites accelerated simultaneously.
  • External Financing Support: To fund this expansion, gross debt issuances increased. In the 6 months to September 30, 2026, the company drew LKR 19.04 billion in term borrowings (net inflow of LKR 15.50 billion after LKR 3.54 billion debt repayments). Cash receipts from share options generated an additional LKR 28.49 million in that period (following LKR 91.10 million in FY 2025/26).
  • Free Cash Flow Divergence: Free Cash Flow to the Firm (FCFF) fell by 67% in FY 2025/26 to LKR 0.89 billion (down from LKR 2.70 billion in FY 2024/25) due to lower operating cash flows and higher capital commitments. Conversely, Free Cash Flow to Equity (FCFE) expanded by 82% to LKR 1.96 billion in FY 2025/26, buoyed by net debt financing.
  • Dividend Suspension: Reflecting disciplined capital allocation, the Board of Directors declared zero dividends for the year ending March 31, 2026 (compared to LKR 1.00 per share / LKR 1.35 billion total distribution in FY 2024/25), retaining LKR 3.55 billion in internally generated economic value to fund the ~LKR 71 billion new project pipeline.

Key Financial Ratios and Growth Indicators

The table below summarizes profitability, leverage, coverage, and market valuation ratios:

Ratio / IndicatorFY 2023/24 (Q1 2024)FY 2024/25 (Q1 2025)FY 2025/26 (Q1 2026)Q3 2026 (6M / Period-End)
Basic EPS (LKR)1.151.321.141.19 (6M)
Diluted EPS (LKR)1.151.321.141.19 (6M)
Net Asset Value per Share (LKR)17.0217.2218.7519.92
Return on Equity (ROE) - Reported6.74%8.50%7.40%Annualized: ~12.2%
ROE - Normalised—5.00%7.40%—
Return on Assets (ROA) - Reported4.60%5.71%4.88%Annualized: ~5.7%
ROA - Normalised—3.30%4.80%—
Return on Capital Employed (ROCE) - Rep.8.16%8.16%6.60%—
ROCE - Normalised—4.90%6.60%—
Gross Gearing Ratio (%)28.50%28.59%30.52%~45.9%
Net Debt to EBITDA (x)—1.31x1.39x—
Interest Cover - Reported (x)2.30x2.93x2.72x3.83x
Interest Cover - Normalised (x)—1.77x2.71x—
EBITDA Interest Cover (x)—4.70x4.70x—
Current Ratio (x)2.48x3.48x2.79x4.25x
Quick (Acid-Test) Ratio (x)2.25x2.94x2.44x3.97x
P/E Ratio (x)17.04x18.90x39.51x33.61x (at LKR 40.00)
Price to Book (P/B) Ratio (x)1.15x1.45x2.40x2.01x
Market Capitalisation (LKR Mn)26,47533,76960,94454,216

Multi-Year Growth Metrics & Operational Benchmarks

  • Top-Line Compounding: Group consolidated revenue achieved a 5-year compound annual growth rate (CAGR) of 16.5%, rising from LKR 4.37 billion in FY 2021/22 to LKR 8.04 billion in FY 2025/26.
  • Installed Capacity Expansion: Total operational portfolio capacity increased from 242.8 MW in mid-2024 to 252.8 MW by March 2026, reaching 267.8 MW by September 2026 (subsidiary capacity reaching 159.5 MW). The forward pipeline of ~295 MW provides visible expansion toward 548 MW.
  • Operating Plant Availability: Technical availability across generation assets was maintained at high levels: mini-hydro availability averaged 99.5%, while the wind sector achieved 86% availability (impacted by scheduled upkeep and turbine component refurbishments). Self-performed O&M generates approximately USD 300,000 in annual cost savings per 10 MW plant.
  • Share Valuation Multiple Expansion: The market price per share rose from LKR 19.60 (March 31, 2024) to LKR 25.00 (March 31, 2025) and closed at LKR 45.00 on March 31, 2026 (+80% annual return), driving the P/E multiple from 18.9x to 39.5x as equity markets re-rated the company’s infrastructure pipeline. The share subsequently consolidated to LKR 40.00 as of September 30, 2026, and LKR 39.00 on November 11, 2026.

Economic and Market Context

Macroeconomic Factors

  • Sri Lankan Power Sector Restructuring: Under the Sri Lanka Electricity Act No. 36 of 2024 and Electricity (Amendment) Act No. 14 of 2025, the state-owned Ceylon Electricity Board was formally unbundled in March 2026 into four distinct state-owned corporations responsible for generation, transmission, distribution, and system operations (National System Operator - NSO). The approval of the National Electricity Policy in March 2026 establishes cost-reflective pricing principles and provides a legal basis for a competitive wholesale electricity market and direct bilateral Power Purchase Agreements between IPPs and commercial consumers.
  • National Decarbonization Mandate: Sri Lanka targets generating 70% of its electricity from renewable sources by 2030 and reaching carbon neutrality by 2050 (under the Long-Term Generation Expansion Plan 2025–2044 and Green Energy Acceleration Plan 2025–2030). Over 10,700 MW of new capacity is planned between 2025 and 2044 to support projected electricity demand growth of 4.8% per annum.
  • Grid Stability & Curtailment Challenges: Surging renewable penetration without matching transmission upgrades led to severe weekend curtailments by the NSO, resulting in significant sector-wide generation losses. This operational challenge has prioritized utility-scale Battery Energy Storage Systems (BESS) as essential grid infrastructure.
  • Interest Rate and Foreign Exchange Volatility: Floating project loans are predominantly linked to the Average Weighted Prime Lending Rate (AWPLR) plus margins, with built-in floors (7.0%–12.0%) and caps (10.0%–17.08%). Sovereign debt restructurings and foreign exchange movements directly impact imported turbine components, inverters, and battery cells. A +/- 100 bps shift in interest rates affects consolidated PBT by +/- LKR 114.17 million, while a 10% appreciation in the USD results in a pre-tax sensitivity impact of LKR 130.36 million.

International Exposure

  • Uganda: Operates the 10 MW Tororo PV Power plant and mini-hydro plants (Mahoma Uganda Ltd - 2.7 MW; Ziba Ltd - 7.6 MW) with utility off-taker Uganda Electricity Transmission Company Limited (UETCL). Offshore revenue accounts for approximately 13% of consolidated revenue, generating USD- and UGX-denominated cash flows.
  • Pakistan: Holds a 30% equity stake in the 50 MW Gharo Solar Limited and a 12.85% unquoted equity investment in the 18 MW Harappa Solar project, supplying K-Electric and CPPA-G.
  • Ukraine: Holds a 12.5% equity interest in Semypolky Solar Limited (9 MW), off-taking to Energorynok / NEURC.
  • African Growth Pipeline: Actively assessing renewable project pipelines across Sierra Leone, Zambia, Uganda, and Mozambique, subject to Central Bank of Sri Lanka regulatory approvals for outward direct investment.

Future Potential and Outlook

WindForce possesses an identified development and construction pipeline exceeding 115 MW of generation assets and 130 MW / 520 MWh of storage assets, representing a total planned capital commitment exceeding LKR 71 billion:

Current Operational Capacity:  253.0 MW (FY26) -> 267.8 MW (Sep 2026)
  + Ground-Mounted Solar:      100.0 MW (Rividhanavi Siyambalanduwa)
  + Wind Power Projects:        60.0 MW (50 MW Mullikulam Lot 1 + 10 MW Safe Power Alankuda)
  + Floating Solar:              5.0 MW (Diya Janani - commissioned Sep 2026)
  + Standalone BESS:           130.0 MW / 520 MWh across 13 locations (10 MW commissioned)
Targeted Portfolio Capacity:   548.0 MW

Detailed Project Execution Milestones

  1. Rividhanavi 100 MW Solar Project (Siyambalanduwa):
  • *Structure:* 50/50 Joint Venture between WindForce PLC, Lakdhanavi Ltd, and Blue Circle Pte Ltd.
  • *Project Cost:* Approximately USD 133 million.
  • *Financing Status:* Reached full financial closure in September 2026, securing LKR 22.736 billion and the LKR equivalent of USD 33 million in syndicated debt led by Sampath Bank PLC, Commercial Bank of Ceylon, NDB Bank, and Nations Trust Bank, alongside the USD 18 million IFC loan facility.
  • *Construction Status:* 24-year land lease executed October 10, 2025. Civil construction underway; foundation works for the 132/33 kV transmission line completed, tower erection in progress, and civil construction of the 132/33 kV grid substation commenced. Scheduled commercial commissioning: August 2027.
  1. Battery Energy Storage Systems (BESS) – 130 MW / 520 MWh (13 Sites):
  • *Structure:* Letters of Award secured under CEB’s competitive tender; 12 projects developed via Storex (Pvt) Ltd (51% WindForce, 49% Vidullanka PLC) and 1 project via a separate WindForce-Vidullanka consortium.
  • *Total Investment:* Estimated LKR 22.52 billion funded under an 80:20 debt-to-equity structure. Contracts structured under a 15-year Build, Own, and Operate (BOO) model.
  • *Progress:* First 10 MW / 40 MWh facility in Anuradhapura commissioned in September 2026 (commercial operations commenced October 1, 2026). The remaining 12 locations have battery packs and transformers installed, targeting completion by December 2026.
  1. Safe Power International 10 MW Wind Project (Alankuda, Puttalam):
  • *Structure:* 51% owned subsidiary; total estimated cost of LKR 4.2 billion (75:25 debt-to-equity).
  • *Operational Status:* Disrupted by Cyclone Ditwah, which collapsed the Thabbowa Bridge on the Trincomalee-Puttalam route. A force majeure extension was granted until May 2027. Mitigation includes transporting heavy components via sea routes using barge operations. Plant design completed; site civil works commenced. Expected commissioning: Q1 FY 2027/28.
  1. Diya Janani 5 MW Floating Solar Project (Dambulu Oya Reservoir):
  • *Structure:* 100% owned subsidiary; investment of LKR 1.18 billion.
  • *Status:* 20-year SPPA executed November 27, 2025. Floaters and modules installed; successfully commissioned in September 2026. Water cooling enhances energy generation efficiency by 5%–15% over ground systems and reduces reservoir surface evaporation by up to 5%.
  1. Mullikulam 50 MW Wind Project (Lot 1):
  • Selected as Lowest Cost Bidder under CEB international tender; PPA in final stages of execution with the NSO.
  1. Commercialization of Engineering & Repair Capabilities:
  • Developing an independent business unit to commercialize its specialized turbine repair workshop (handling permanent magnet generators, gearboxes, and electronic circuitry), offering services across Sri Lanka and the wider South Asian market.
  • Commercializing proprietary SCADA and IoT monitoring software platforms developed in-house via joint venture Energenix (Pvt) Ltd.
  1. Wind Asset Repowering:
  • Transitioning aging wind turbines (e.g., at Seguwanthivu and Vidatamunai, operating since 2010) to higher-capacity next-generation turbines (such as Goldwind GW 121), supported by 20-year PPA extensions already secured for hydro assets.

Risks and Challenges

The Group’s enterprise risk profile is actively monitored by the Board Risk Committee and the Management Risk Committee:

Risk FactorSeverity / ScoreOperational / Financial ImpactMitigation Strategy
Energy Curtailment & Grid LimitationsCritical (Score: 20)Grid congestion and weekend dispatch cuts resulted in a generation loss of 20.6 GWh in FY26 (LKR 317M revenue loss) and LKR 193.57M loss in 6M FY27.Developing 130 MW / 520 MWh BESS to store excess generation for peak dispatch (6 PM - 10 PM); real-time SCADA integration via secure API with the NSO control centre; pursuing PUCSL tariff compensation.
Off-taker Payment & Liquidity RiskCritical (Score: 20)Historical payment arrears from CEB/NSO strain working capital, stretching receivable collection days to 70 days.Daily engagement with NSO Treasury; securing diversified working capital credit lines; maintaining an LKR 1.80B money market facility and substantial short-term deposits.
Project Execution & Natural HazardsCritical (Score: 20)Cyclone Ditwah collapsed the Thabbowa Bridge, delaying Alankuda wind project; flooding hazards at low-salinity solar sites.Declared force majeure extending Alankuda timeline to May 2027; mobilized sea-barge logistics; elevated civil plinths and sub-stations; implemented flood mitigation bunds and comprehensive CAR/EAR insurance.
Generator Rotor Magnet DegradationCritical (Score: 20)Coastal humidity and harsh weather caused corrosion of Permanent Magnet Generators (PMGs) across 31 turbines, driving plant downtime.Executed internal R&D program using vacuum resin infusion and anti-corrosion coatings. Eight PMGs refurbished in-house in FY26 with remaining fleet slated for FY27, saving external overseas repair costs.
Foreign Exchange & Capital Cost RiskHigh (Score: 20)Currency volatility elevates import costs for PV modules, batteries, and wind turbine equipment.Sourced long-term USD concessional debt via the IFC (USD 18M); entered forward contracts with banks; structured dollar-pegged components into off-take tariffs where feasible.
Interest Rate VolatilityHigh (Score: 12)Floating borrowing rates tied to AWPLR on project debt of LKR 12.41B+ directly impact finance charges (+/- 100 bps shift = +/- LKR 114M PBT impact).Negotiated interest rate floors (7.0%-12.0%) and caps (10.0%-17.08%) on major project facilities; blended with fixed-rate debt instruments.
Goodwill Impairment RiskModerate-HighPast acquisitions carry LKR 2.10B in goodwill, susceptible to impairment if plant cash flows or tariffs decline.Recognized LKR 390M impairment in FY 2024/25, LKR 108.09M in FY 2025/26, and LKR 70.00M in 6M FY 2026/27 based on annual discounted cash flow / VIU assessments.
Material Legal ContingenciesHigh ExposureSenok Trade Combine filed High Court Case CHC/156/24/MR claiming EUR 4.0M (LKR 1.93B) plus LKR 87.75M/month damages for crane collapse at Hiruras site. Rividhanavi road access disputes with Ethimale Plantation.Hiruras initiated counter-claim against LOLC General Insurance (LKR 385M); alternative site access developed for Rividhanavi, preventing project disruption.

Shareholder and Corporate Information

Equity Structure and Public Float

  • Total Stated Capital: LKR 18,341,652,935 as of March 31, 2026 (represented by 1,354,303,889 fully paid ordinary voting shares). Following partial ESOS exercises, stated capital increased to LKR 18,377,679,025 (1,355,409,389 shares) as of September 30, 2026.
  • Public Shareholding: As of September 30, 2026, the public holding percentage stood at 24.57%, held across 9,174 public shareholders (total shareholders: 9,195).
  • Float-Adjusted Market Capitalization: LKR 13,318,794,820 as of September 30, 2026 (and LKR 14,972,642,075 as of March 31, 2026). The company complies with Option 1 of CSE Listing Rule 7.13.1(a) (minimum LKR 10.0 billion float market capitalization requirement).

Share Ownership Distribution

As of September 30, 2026, the 20 largest shareholders held 90.20% of the company's issued shares:

RankShareholder NameShareholding (Shares)Ownership (%)
1Akbar Brothers (Pvt) Ltd492,754,40436.35%
2Hirdaramani Private Limited279,211,86420.60%
3Mona Exports (Pvt) Limited126,920,6669.36%
4BBH - Tundra Sustainable Frontier Fund83,018,9876.13%
5Amaliya Private Limited44,676,8273.30%
6Mr. K. B. M. I. Perera (Managing Director)43,625,0523.22%
7Hirdaramani Power Private Limited31,827,9272.35%
8Quick Tea (Pvt) Ltd16,568,0031.22%
9Mr. H. M. Udeshi (Director)14,550,0001.07%
10Tea House (Pvt) Ltd13,092,2180.97%
11J.B. Cocoshell (Pvt) Ltd12,804,5000.94%
12Cocoshell Activated Carbon Company (Pvt) Ltd12,440,0000.92%
13Saboor Chatoor (Pvt) Ltd8,300,0000.61%
14Mr. M. K. T. Darwazeh7,413,7610.55%
15Mr. S. K. T. Darwazeh7,413,7610.55%
16Mouldex (Pvt) Ltd7,401,6480.55%
17Marina Blue (Private) Limited6,969,1840.51%
18Employees Trust Fund Board4,601,8940.34%
19DFCC Bank PLC A/C No. 024,573,7420.34%
20Mr. F. M. T. Darwazeh4,444,4460.33%
—Other Public Shareholders132,800,5059.80%
Total1,355,409,389100.00%

Directors' and Executive Shareholdings

Directors' and CEO direct shareholdings as of September 30, 2026:

  • Mr. R. P. Pathirana (Chairman): 1,963,323 shares
  • Mr. K. B. M. I. Perera (Managing Director): 43,625,052 shares
  • Mr. H. M. Udeshi (Director): 14,550,000 shares
  • Mr. A. A. Akbarally (Deputy Chairman): 166,145 shares
  • Mr. Huzefa Akbarally (Director): 166,145 shares
  • Mr. Hussain Akbarally (Director): 166,145 shares
  • Mr. V. K. Hirdaramani (Director): 186,145 shares
  • Mr. J. B. S. L. Wimalasena (Chief Executive Officer): 500,000 shares
  • Directors with Zero Holdings: Mrs. Saumya Amarasekera, Mr. Savantha De Saram, Mr. Sanjay Kulatunga.

Share Price Performance Overview

  • FY 2023/24: Closed at LKR 19.60 (Range: LKR 14.80 - LKR 20.40).
  • FY 2024/25: Closed at LKR 25.00 (Range: LKR 19.20 - LKR 27.80).
  • FY 2025/26: Closed at LKR 45.00 (Range: LKR 22.90 - LKR 56.10), representing an 80% annual price appreciation.
  • Interim FY 2026/27: Traded between LKR 38.50 and LKR 41.90 during Q3 2026, closing at LKR 40.00 on September 30, 2026.
  • 90-Day Trading Session Snapshot (July 3, 2026 – November 11, 2026): Traded within a price range of LKR 34.80 – LKR 41.40, closing at LKR 39.00 on November 11, 2026 (-4.88% 90-session return). Average daily turnover stood at LKR 11.14 million (median LKR 3.31 million) with foreign holding moderating from 9.82% to 8.08% (-1.74 pp net foreign selling of 23.55 million shares).

Investment Decision Indicators

Key Strengths

  1. Market Dominance & Scale Advantage: Largest private sector renewable developer in Sri Lanka with 267.8 MW operational capacity and 14% national renewable market share, supported by fully integrated EPC and in-house O&M capabilities saving ~USD 300,000 per 10 MW plant.
  2. Technological & Multi-Baseload Diversification: Balanced portfolio across solar (142.3 MW), wind (84.2 MW), and mini-hydro (26.3 MW) mitigating single-resource climatic exposure, complemented by first-mover advantage in commercial floating solar and utility-scale BESS.
  3. Resilient Long-Term Cash Flows: Backed by 20-year sovereign-guaranteed Power Purchase Agreements with state utilities; successfully obtained 20-year extensions for expiring hydro assets.
  4. Strong Normalized Profitability: Normalized PAT expanded 62% YoY in FY 2025/26 to LKR 2.14 billion; normalized ROCE expanded to 6.6% from 4.9%.
  5. High-Profile Institutional Backing: Secured long-term funding and corporate governance integration from the International Finance Corporation (World Bank Group), alongside credit affirmation at A+(lka) Stable by Fitch Ratings.

Weaknesses

  1. Elevated Working Capital Absorption: Lengthening receivable cycles from the Ceylon Electricity Board (trade receivables reached LKR 3.22 billion at September 30, 2026) alongside large inventory outlays, depressing operating cash flows during capital-intensive periods.
  2. Pronounced Earnings Seasonality: Wind concentration creates significant earnings volatility between high-wind quarters (Q2/Q3 PAT averaging >LKR 800M–950M) and low-wind quarters (Q1/Q4 PAT ranging from LKR 350M down to net losses).
  3. Goodwill Amortization Burden: Past acquisitions carry continuous annual goodwill impairment provisions (LKR 390 million in FY25, LKR 108 million in FY26, and LKR 70 million in 6M FY27).
  4. Aging Turbine Base: Select 14-year-old wind installations (Seguwanthivu and Vidatamunai) exhibit declining availability, higher maintenance outlays, and corrosion issues requiring ongoing capital reinvestment.

Opportunities

  1. Pipeline Scale & Capacity Doubling: Active execution of ~295 MW pipeline (100 MW Rividhanavi solar, 130 MW / 520 MWh BESS, 50 MW Mullikulam wind, 10 MW Safe Power) is positioned to expand operating asset base to 548 MW (+105% capacity increase).
  2. Grid-Scale BESS Arbitrage & Grid Support: First-mover capture of 13 standalone BESS contracts provides high-margin capacity charges, ancillary services revenue, and evening peak power supply tariffs.
  3. Power Sector Deregulation: Restructuring of the CEB under Electricity Act No. 36 of 2024 opens opportunities for direct private-to-private PPAs with commercial and industrial off-takers at higher realization rates.
  4. Engineering Services & IP Commercialization: Expanding the internal component refurbishment workshop and Energenix SCADA/IoT software into third-party revenue streams across South Asia.
  5. Pending Tariff Compensation: Potential recovery of LKR 500M+ in accumulated revenue losses from grid curtailments following PUCSL compensation framework directives.

Threats

  1. System-Wide Grid Curtailment: Persistent grid transmission bottlenecks could cause ongoing energy curtailment until BESS installations are fully integrated and commissioned.
  2. Sovereign Counterparty Concentration: Sri Lankan operations remain heavily dependent on the credit risk profile and prompt settlement discipline of the National System Operator.
  3. Material Litigation Liabilities: Significant financial exposure regarding the Senok Trade Combine crane collapse claim (exceeding LKR 1.93 billion plus monthly claims).
  4. Macroeconomic & Foreign Exchange Exposure: Reliance on imported solar panels, BESS storage cells, and wind turbines exposes project capital expenditures and debt service to currency fluctuations and global supply chain bottlenecks.

Comprehensive Financial Data Summary

Indicator (Consolidated)UnitFY 2021/22FY 2022/23FY 2023/24FY 2024/25FY 2025/266M Ended Sep 30, 2026
Installed CapacityMW218.0218.0230.1242.8252.8267.8
Gross GenerationGWh———562569219 (Subsidiaries)
Consolidated RevenueLKR Mn4,367.374,953.495,851.806,902.698,040.265,609.60
Gross ProfitLKR Mn2,713.203,001.233,864.544,129.234,250.303,211.86
Operating Profit (EBIT)LKR Mn2,538.453,017.673,270.393,386.243,096.002,429.86
Profit Before TaxLKR Mn2,237.832,358.942,555.102,949.902,453.742,272.16
Profit After TaxLKR Mn1,951.831,782.861,750.592,249.692,151.241,856.65
PAT Attributable to ParentLKR Mn1,574.931,479.941,549.551,787.081,539.591,610.20
Total AssetsLKR Mn30,519.1439,802.2438,041.8639,424.4544,082.0464,671.55
Total Debt (Gross)LKR Mn—9,727.409,960.6710,427.0912,406.0127,965.07
Total EquityLKR Mn22,820.9325,199.3225,459.5326,399.2728,975.6032,936.60
Parent EquityLKR Mn20,880.4822,820.7122,994.1823,266.6525,388.4227,000.38
Operating Cash FlowLKR Mn—582.795,960.663,139.321,519.04(6,989.58)
Basic EPSLKR1.171.101.151.321.141.19
Dividend Per ShareLKR——1.001.000.000.00
Net Asset Value Per ShareLKR15.4616.8917.0217.2218.7519.92

Investor Decision Synthesis

  • Long-Term Horizon Evaluation: WindForce PLC represents an infrastructure-growth asset undergoing a balance-sheet scaling phase. The simultaneous commercialization of the 100 MW Siyambalanduwa project and the 130 MW / 520 MWh BESS portfolio presents a clear catalyst for doubling the operating generation base by 2027. Investors focused on structural growth benefit from long-term contracted cash flows, regulatory tailwinds supporting Sri Lanka's 70% clean energy transition, and low-cost in-house engineering and O&M execution.
  • Near-Term Horizon Evaluation: Shorter-term participants face dividend suspension, elevated leverage as total debt exceeds LKR 27 billion during active construction, interim working capital strain, and persistent grid curtailment risks until the full BESS network is operational. The stock's valuation multiple expansion (trading above 30x–39x trailing earnings) reflects substantial growth expectations already priced into the equity, requiring execution milestones (BESS completion by December 2026 and Rividhanavi completion by August 2027) to support underlying earnings and return ratios.